FOOD HALL BERLIN

Formwerk is accompanying a comprehensive refurbishment in a Berlin shopping mall. The basement is being transformed into a food hall and event area. A successful food hall is characterized by high-quality, local and sustainable food offerings and the integration of local history, architecture and culture. The common goal is to create an attraction that attracts visitors and plays a central role in the cityscape. ‍

Status: in planning

Work phases 2-8

Work phase 2 — pre-planning

  • Analysis of site conditions and framework conditions
  • Development of a rough concept for the food hall
  • First consultations with authorities on permit requirements
  • Preparation of an initial cost framework and schedule
  • Work phase 3 — design planning

  • Detailed floor plan and concept planning
  • Coordinating requirements with future operators and restaurateurs
  • Definition of functional areas (kitchens, seating areas, storage areas, technical rooms)
  • First material and design concepts for interior design
  • Cost calculation in accordance with DIN 276
  • Work phase 4 — approval planning

  • Preparation of building application documents
  • Coordination with authorities and submission of the building application.
  • Consideration of fire protection, hygiene standards and noise protection requirements.
  • Adjustment of planning based on feedback from authorities
  • Work phase 5 — implementation planning

  • Detailed planning of all components, materials and technical systems
  • Preparation of detailed plans for architecture, interior design and technical trades
  • Integration of sustainable solutions (e.g. energy-efficient lighting, recycling concepts)
  • Work phase 6 — Preparation for the award

  • Preparation of specifications for all trades (interior design, building services, kitchen construction)
  • Obtaining offers and preparing a cost overview
  • Support with tendering and award recommendations
  • Service phase 7 — participation in awarding

  • Review of received offers and negotiations with contractors
  • Preparation of contract documents for contracted companies
  • Support in the final procurement
  • Service phase 8 — object monitoring

  • Supervision of construction work in terms of quality, deadlines and costs
  • coordination of trades (interior design, technology, furniture)
  • Carrying out approvals and corrective checks
  • Documentation of construction progress and cost control
  • Gemeinsam besondere Erlebnisse schaffen

    Projekt anfragen